01forum
01 — Consultation
Menu, covers, service style, opening hours and budget. What the kitchen has to produce decides everything after this.
02straighten
02 — Site survey
A measured survey of the space, the services capacity already in the building, the access route and the extraction path.
03grid_view
03 — Kitchen planning
Workflow zoning from goods-in to wash-up, the staffing model it implies, and the equipment schedule that follows.
04checklist_rtl
04 — Equipment selection
Every unit specified against your menu and duty cycle — not against a catalogue page — with alternatives priced side by side.
05architecture
05 — Technical drawings
Plans, elevations, services drawings and a numbered equipment schedule your contractor can build from.
06plumbing
06 — MEP coordination
Gas, water, drainage, electrical loads and ventilation coordinated with your consultants and the building's own constraints.
07local_shipping
07 — Supply
Scheduled to your programme and stored in our warehouse until the site is genuinely ready to receive it.
08handyman
08 — Installation
Our own crews and certified subcontractors, working to the drawing set rather than to whatever fits.
09science
09 — Testing
Gas pressure tests, electrical certification, water treatment checks and airflow balancing across the canopy.
10school
10 — Commissioning and staff training
Every unit run under load, calibrated and signed off in a commissioning report you keep — with your brigade trained on each one at handover, and the cleaning and daily-check routines documented in Arabic and English.
11event_repeat
11 — Maintenance contract
Planned preventive visits, an agreed response time and a parts holding, so year three looks like year one.